Home ProductsOilfield Cementing Tools

Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life

I'm Online Chat Now

Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life

China Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life supplier
Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life supplier Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life supplier Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life supplier

Large Image :  Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life

Product Details:

Place of Origin: China
Brand Name: TIPTOP
Certification: Inspection Certificate
Model Number: Cementing Plug

Payment & Shipping Terms:

Minimum Order Quantity: 1pc
Price: Negotiation
Packaging Details: seaworthy wooden box
Delivery Time: 7-30 days
Payment Terms: T/T, L/C, D/A, D/P
Supply Ability: 20000 pcs per month
Contact Now
Detailed Product Description
Casing Size: 7'', 9 5/8'', 13 3/8'' Petal: Yes
Application: Downhole Cementing Temperature: 120°C
Type: Oilfield Cementing Tools Function: Isolate Drilling Fluid And Cement Slurry
High Light:

oilfield cementing equipment

,

casing swage tool

Oilfield Cementing Tools, Top & Bottom Cementing Plug, 120°C​

 

The cementing plug plays the role of isolating drilling fluid and cement slurry and pressing in the cementing operation. The rubber plug is divided into upper plug and lower plug. The difference between the top plug and the bottom plug is that the bottom plug has a rupture disk. The purpose of the upper plug is to separate the cement slurry from the fluid behind it to minimize damage. Different from the lower rubber plug, the rubber plug is placed behind the cement slurry, which is solid and can block the rubber plug. When the upper rubber plug hits the lower rubber plug, the pressure will rise, indicating that the cementing operation is over. The rubber plug is placed in front of the cement slurry to minimize mixing of the cement slurry with the drilling fluid and to minimize damage. The lower rubber plug can also scrape off the floating mud on the inner wall of the casing. When the lower rubber plug descends to the floating hoop, the pressure difference will cause the rupture disc in the lower rubber plug to rupture, and the cement slurry enters the annulus.

 

For any inquiries, please feel free to contact us.
 
Specification

Casing Sizes (inch) Cementing Plug
Top Plug Bottom Plug Petal Temperature
Size D
mm (inch)
Size D
mm (inch)
7'' PGT7 Φ170 (6 45/64) PGB7 Φ170 (6 45/64) Yes 120°C
9 5/8'' PGT245 Φ232 (9 9/64) PGB245 Φ232 (9 9/64) Yes 120°C
13 3/8'' PGT339 Φ325(12 13/16) PGB339 Φ325(12 13/16) Yes 120°C

 Drilling Fluid Oilfield Cementing Tools Top & Bottom Cement Plug Long Service Life

Contact Details
Xi'An Tiptop Machinery Co., Ltd.

Contact Person: Sales Manager

Send your inquiry directly to us (0 / 3000)